sgit newsroom v0.1.29 · snapshot 2026-09-24

Reading room · riskmandate.ai

On this page

Reading room / riskmandate.ai · raw text · live ↗

From riskmandate.ai, the page as fetched on 2026-09-25 · open the live page ↗Everything on this sheet is the source site's own text; the newsroom's chrome is outside it.

Where we are, and what is next

Rendered from .claude/onboarding/03-state-and-next.md in the repository. The text below is that file. Source: https://riskmandate.ai/admin/agents/03-state-and-next/↗ · noindex · written by scripts/site/build-admin.mjs

Keep this file true. If you land something, move it; if you learn something, add it. Dates are the site's; check site/versions/index.json for the current version before trusting the number here.

State as at 2026-09-21, v1.28.0

TierVaults
measured on the thing itselfclaude-code-web (13/20 rows), github-actions (8/8), n8n-owner-api-key (7/8, from an early beta user's write-up), claude-gmail-connector (4/6, below)
derived from the model site's five examplesclaude-code-cli, claude-code-cli-confirmations-off, claude-desktop, claude-web-connectors, chatgpt-web, browser-extension, scheduled-job
documented from vendor pages, 15 Sept, with open questionsgoogle-workspace-mcp (4), gmail-readonly (3), google-drive-readonly (3), claude-m365-connector (4), dropbox-mcp (4)
measured on the deployer's own account, 16 Septclaude-gmail-connector (oc433z3m, 4 of 6 rows measured, 5 contradictions, 6 open questions; in Mail & files connectors). Its customer instance is pushed as a private vault xjir6m0c (status draft), key handed to the lead in the session; the anonymised inputs stay under vaults-instances/

The queue, in order

From the graph brief (direction__abp-as-a-graph-and-stakeholder-views.md §4), then the research and vault queues. Each has a task brief in .claude/briefs/.

#TaskBriefSizeStatus
1By behaviour facet on the library—smalldone v1.16.0
2One page per behaviour: behaviour-<id>.html, generated from the catalogueT01a dayopen
3data/edges.json per vault: the grant as edges, one per path, barrier on the pathT02a dayopen
4Metrics on behaviours (speed, volume, blast) as coarse ordinals in a vocabulary extensionT03half a day + a Lab 03 askopen
5Outward links per behaviour: ATT&CK technique ids, GDPR articles, citedT03a dayopen
6Views per audience + prompts + projections, regenerated by the build, refused when staleT04several daysopen, after 2–5
7Settle the 18 open questions across the five connector vaultsT05a day per vaultopen
8The next five connector vaultsT06half a day eachopen
9The three business-function vaultsT06after 8open
10Lab 03: add the asks from the n8n review and the graph brief (barrier per path; a word for a broad-but-real gate; metrics and links on the primitives)T07two hoursopen
11The two Voice Debrief use-case vaults, and a use-case group on the libraryT10a day, after the workflow agent runs the promptopen
11aBoth pushes done 16 Sept (oc433z3m public, xjir6m0c private). Still owed: the twelve screens as redacted image files in evidence/; the correction call (§4 of the workflow brief)—the leadwaiting on the lead
12Stop deploying the vault: inputs in the repository, the product in the vaultT09half a dayopen
13A page for the £500 workflow once the store has a return address; a per-shape header on MAP-A-GRANT.md—smallwaiting on the store agent
14Point the four payment links' success address at paid-t<n>.html (level 1: paid-t1.html?shape=<slug>&order=<ref>); the level-3 text on the store's product page; the opinion add-on page (brief D9)—the store'swaiting on the store agent
15Done v1.24.0 — the MVP vault: LICENCE.md + licence block in the build; the v3 reading app with the left navigation, Who are you?, Your keys, Keep it, Download; a new app vault; oc433z3m re-pushed; the vault page repositioned (direction__mvp-vault-and-the-reading-app.md)—two and a half daysthe lead's four decisions answered 16 Sept; renderer v5 in a new app vault vbhmlulo; oc433z3m re-pushed; the dual licence in the build
16Done v1.24.0 — the consequence layer for oc433z3m: assets, consequences, routes out, two scenarios; the research list documented from Google's pages; the standards mini-graphsT11, T12doneeleven consequences, six assets, two routes out, the standards mini-graphs; the research list (Google's pages, Claude's web tools) is still open — T05/research-vault

Decisions the lead owns (open)

Known rough edges